CyrusOne NYM7 Wappingers Falls Data Center

Wappingers Falls, New York, United StatesOperating
Evidence
Planned critical IT
10 MW
Updated
Oct 28, 2026

CyrusOne NYM7 Wappingers Falls Data Center, also known as CyrusOne NYM7, is a data center project in Wappingers Falls, NY, US associated with CyrusOne. 100,000-square-foot facility; 37,000 square feet of raised white floor; up to 10 MW of power. New York metro facility with full N+1 and 2N redundancy, carrier-neutral connectivity and business-continuity space. CyrusOne’s current NYM7 profile reports 3 MW of IT capacity. The legacy 10 MW figure was facility power, not current IT capacity.

Capacity

Reported capacity

Design

10 MW

Source

Reported capacity

Planned / design or future potential

3 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

CyrusOne’s current NYM7 profile reports 3 MW of IT capacity. The legacy 10 MW figure was facility power, not current IT capacity.

Participants

CyrusOne

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

CyrusOne NYM7 | Wappingers Falls | NY | US

Source

Location context

Actual

CyrusOne NYM7 | Wappingers Falls | NY | US

Source

Building area

Actual

100,000 square feet

Source

Work area recovery

Actual

25,000 square feet

Source

Additional project facts

Lifecycle status

Actual

Operational

Source

Capacity basis

Actual

CyrusOne publishes up to 10 MW for NYM7; Cartis records 10 MW as the facility design ceiling.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

CyrusOne’s current NYM7 profile reports 3 MW of IT capacity. The legacy 10 MW figure was facility power, not current IT capacity.

Source

Raised white floor

Actual

37,000 square feet

Source

Infrastructure & permits

Technical details (2)
Electric grid

Energized

New York metro facility with full N+1 and 2N redundancy, carrier-neutral connectivity and business-continuity space.

Cooling system

Operational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Public-source research. Plans may change. See Evidence for sources and qualifications.