CyrusOne NYM7 Wappingers Falls Data Center

Wappingers Falls, New York, United StatesOperating / Stabilized
Capacity
10 MW
Planned critical IT
Lead participant
CyrusOne
Developer
Last updated
Aug 28, 2026
Most recent public record update

About CyrusOne NYM7 Wappingers Falls Data Center

CyrusOne NYM7 Wappingers Falls Data Center, also known as CyrusOne NYM7, is a data center project in Wappingers Falls, NY, US associated with CyrusOne. 100,000-square-foot facility; 37,000 square feet of raised white floor; up to 10 MW of power. New York metro facility with full N+1 and 2N redundancy, carrier-neutral connectivity and business-continuity space. CyrusOne’s current NYM7 profile reports 3 MW of IT capacity. The legacy 10 MW figure was facility power, not current IT capacity.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load10 MWDesign · CyrusOne NYM7 Wappingers Falls Data Center
Design3 MWDesign · CyrusOne NYM7 Wappingers Falls Data Center

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

CyrusOne’s current NYM7 profile reports 3 MW of IT capacity. The legacy 10 MW figure was facility power, not current IT capacity.

Aug 27, 2026
Current source record reviewed for CyrusOne NYM7
Completed

Infrastructure

Electric GridEnergized

New York metro facility with full N+1 and 2N redundancy, carrier-neutral connectivity and business-continuity space.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

11 facts
Location Context
CyrusOne NYM7 | Wappingers Falls | NY | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
10 MW
Design
Capacity Basis
CyrusOne publishes up to 10 MW for NYM7; Cartis records 10 MW as the facility design ceiling.
Actual
Location Context
CyrusOne NYM7 | Wappingers Falls | NY | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
3 MW
Design
Capacity Basis
CyrusOne’s current NYM7 profile reports 3 MW of IT capacity. The legacy 10 MW figure was facility power, not current IT capacity.
Actual
Building Area
100,000 square feet
Actual
Raised White Floor
37,000 square feet
Actual
Work Area Recovery
25,000 square feet
Actual