CyrusOne NYM2 Totowa Data Center

Totowa, New Jersey, United StatesOperating / Stabilized
Capacity
6 MW
Planned critical IT
Lead participant
CyrusOne
Developer
Last updated
Aug 28, 2026
Most recent public record update

About CyrusOne NYM2 Totowa Data Center

CyrusOne NYM2 Totowa Data Center, also known as CyrusOne NYM2, is a data center project in Totowa, NJ, US developed and operated by CyrusOne. Two-building, 200,000-square-foot facility with 50,000 square feet of colocation space, 60,000 square feet of recovery workspace and 6 MW total IT capacity. National interconnection platform access, high-density support, N+1 cooling and multilayer perimeter and biometric security.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load6 MWDesign · CyrusOne NYM2 Totowa Data Center
Design6 MWDesign · CyrusOne NYM2 Totowa Data Center

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

6 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 28, 2026
Current source record reviewed for CyrusOne NYM2
Completed

Infrastructure

Electric GridEnergized

National interconnection platform access, high-density support, N+1 cooling and multilayer perimeter and biometric security.

Cooling SystemOperational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
CyrusOne NYM2 | Totowa | NJ | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
6 MW
Design
Capacity Basis
CyrusOne publishes 6 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne NYM2 | Totowa | NJ | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
6 MW
Design
Capacity Basis
6 MW facility or campus design capacity.
Actual
Project Boundary
CyrusOne NYM2
Actual
Location Context
Totowa, NJ, US
Actual
Lifecycle Status
Operating
Actual
Capacity Basis
6 MW facility or campus design capacity.
Actual