CyrusOne NYM1 Somerset Data Center
Operating / Stabilized · Somerset, New Jersey, United States
CyrusOne NYM2 Totowa Data Center, also known as CyrusOne NYM2, is a data center project in Totowa, NJ, US developed and operated by CyrusOne. Two-building, 200,000-square-foot facility with 50,000 square feet of colocation space, 60,000 square feet of recovery workspace and 6 MW total IT capacity. National interconnection platform access, high-density support, N+1 cooling and multilayer perimeter and biometric security.
Projects sharing a market, utility, or organization.
Operating / Stabilized · Somerset, New Jersey, United States
6 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.
National interconnection platform access, high-density support, N+1 cooling and multilayer perimeter and biometric security.
CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.
No map point available
Published claims and their source links.