CyrusOne DUR1 Durham Data Center Campus

Durham, North Carolina, United StatesOperating
Evidence
Planned critical IT
50 MW
Updated
Oct 28, 2026

CyrusOne DUR1 Durham Data Center Campus, also known as CyrusOne DUR1, is a data center project in Durham, NC, US associated with CyrusOne. Research Triangle Park facility; more than 420,000 square feet; 92,320 square feet of raised floor; 50 MW IT capacity. Carrier-neutral enterprise facility with redundant power, advanced cooling and high-performance-computing capability.

Capacity

Reported capacity

Design

50 MW

Source

Reported capacity

Planned / design or future potential

50 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

50 MW is the operator-published facility or campus design boundary.

Participants

CyrusOne

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

CyrusOne DUR1 | Durham | NC | US

Source

Location context

Actual

CyrusOne DUR1 | Durham | NC | US

Source

Location context

Actual

Durham, NC, US

Source

Development detail

Actual

Research Triangle Park facility; more than 420,000 square feet; 92,320 square feet of raised floor; 50 MW IT capacity.

Source

Additional project facts

Lifecycle status

Actual

Operational

Source

Capacity basis

Actual

CyrusOne publishes 50 MW of total IT capacity for the DUR1 facility.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

50 MW facility or campus design capacity.

Source

Project boundary

Actual

CyrusOne DUR1

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

50 MW facility or campus design capacity.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Energized

Carrier-neutral enterprise facility with redundant power, advanced cooling and high-performance-computing capability.

Cooling system

Operational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Public-source research. Plans may change. See Evidence for sources and qualifications.