CyrusOne DUR1 Durham Data Center Campus

Durham, North Carolina, United StatesOperating / Stabilized
Capacity
50 MW
Planned critical IT
Lead participant
CyrusOne
Developer
Last updated
Aug 28, 2026
Most recent public record update

About CyrusOne DUR1 Durham Data Center Campus

CyrusOne DUR1 Durham Data Center Campus, also known as CyrusOne DUR1, is a data center project in Durham, NC, US associated with CyrusOne. Research Triangle Park facility; more than 420,000 square feet; 92,320 square feet of raised floor; 50 MW IT capacity. Carrier-neutral enterprise facility with redundant power, advanced cooling and high-performance-computing capability.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load50 MWDesign · CyrusOne DUR1 Durham Data Center Campus
Design50 MWDesign · CyrusOne DUR1 Durham Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

50 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Current source record reviewed for CyrusOne DUR1
Completed

Infrastructure

Electric GridEnergized

Carrier-neutral enterprise facility with redundant power, advanced cooling and high-performance-computing capability.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
CyrusOne DUR1 | Durham | NC | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
50 MW
Design
Capacity Basis
CyrusOne publishes 50 MW of total IT capacity for the DUR1 facility.
Actual
Location Context
CyrusOne DUR1 | Durham | NC | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
50 MW
Design
Capacity Basis
50 MW facility or campus design capacity.
Actual
Project Boundary
CyrusOne DUR1
Actual
Location Context
Durham, NC, US
Actual
Lifecycle Status
Operating
Actual
Development Detail
Research Triangle Park facility; more than 420,000 square feet; 92,320 square feet of raised floor; 50 MW IT capacity.
Actual
Capacity Basis
50 MW facility or campus design capacity.
Actual