CyrusOne DUR1 Durham Data Center Campus
About CyrusOne DUR1 Durham Data Center Campus
CyrusOne DUR1 Durham Data Center Campus, also known as CyrusOne DUR1, is a data center project in Durham, NC, US associated with CyrusOne. Research Triangle Park facility; more than 420,000 square feet; 92,320 square feet of raised floor; 50 MW IT capacity. Carrier-neutral enterprise facility with redundant power, advanced cooling and high-performance-computing capability.
Capacity
Planned critical ITDevelopment
1 phases · 1 milestones50 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.
Infrastructure
Carrier-neutral enterprise facility with redundant power, advanced cooling and high-performance-computing capability.
Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.