Skip to content
All records
Data center siteSite record

CyrusOne CIN6 Florence Data Center

Florence, Kentucky, United StatesOperating / Stabilized
Capacity
5 MW
Planned critical IT
Lead participant
CyrusOne
Developer
Last updated
Aug 28, 2026
Most recent public record update

About CyrusOne CIN6 Florence Data Center

CyrusOne CIN6 Florence Data Center, also known as CyrusOne CIN6, is a data center project in Florence, KY, US developed and operated by CyrusOne. 143,000-square-foot Cincinnati-area facility with 55,000 square feet of white space and 5 MW total IT capacity. Multiple redundancy levels, mixed air- and water-cooled chillers, high-density support and 24-hour physical security.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load5 MWDesign · CyrusOne CIN6 Florence Data Center
Design5 MWDesign · CyrusOne CIN6 Florence Data Center

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

5 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 28, 2026
Current source record reviewed for CyrusOne CIN6
Completed

Infrastructure

Electric GridEnergized

Multiple redundancy levels, mixed air- and water-cooled chillers, high-density support and 24-hour physical security.

Cooling SystemOperational

CyrusOne describes closed-loop or air-cooled systems; the profile does not infer facility water use beyond the cited site specification.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
CyrusOne CIN6 | Florence | KY | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
5 MW
Design
Capacity Basis
CyrusOne publishes 5 MW of critical IT capacity for this record boundary.
Actual
Location Context
CyrusOne CIN6 | Florence | KY | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
5 MW
Design
Capacity Basis
5 MW facility or campus design capacity.
Actual
Project Boundary
CyrusOne CIN6
Actual
Location Context
Florence, KY, US
Actual
Lifecycle Status
Operating
Actual
Capacity Basis
5 MW facility or campus design capacity.
Actual