Cartis diligence evidence schedule
Christopher M. Crane Clean Energy Center Restart
PRJ-0112 · Energy asset · Londonderry Township / Middletown, Pennsylvania, United States
Record last updated Oct 28, 2026
Scope and capacity
A Federal Register notice published September 25, 2026 records the final environmental finding of no significant impact for the proposed Crane reauthorization. This environmental finding is not final safety approval or authorization to restart the reactor. Constellation is restarting the 835-MW former Three Mile Island Unit 1 under a 20-year Microsoft power-purchase agreement, subject to nuclear and grid approvals. Christopher M. Crane Clean Energy Center Restart is in Londonderry Township / Middletown, PA, US and is a energy asset restart with construction status.
Headline: 835 MW Planned / design
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Jump to a claim (8)
Nameplate capacity · 835 MW
Planned / design or future potential · Christopher M. Crane Clean Energy Center Restart (Project)
Claim 12717 · Recorded claim type: Not stated · Review: Approved · Claim date: Not stated
Headline treatment: Selected headline
- NRC public meeting on possible Crane restart
U.S. Nuclear Regulatory Commission · Document date: Jul 14, 2026 · Corroborating
Source reference: SRC-0770 · Government record · Recorded authority: Official primary
Source URL
https://www.nrc.gov/sites/default/files/cdn/doc-collection-news/2026/26-019-i-a.pdf
https://www.nrc.gov/sites/default/files/cdn/doc-collection-news/2026/26-019-i-a.pdf
- FERC waiver advances Three Mile Island restart
Utility Dive · Document date: Jun 3, 2026 · Corroborating
Source reference: SRC-0772 · News report · Recorded authority: Secondary
Source URL
https://www.utilitydive.com/news/constellation-three-mile-island-crane-nuclear-ferc-waiver/821836/
https://www.utilitydive.com/news/constellation-three-mile-island-crane-nuclear-ferc-waiver/821836/
- FERC order granting interconnection waiver for Crane
Federal Energy Regulatory Commission · Document date: Jun 1, 2026 · Corroborating
Source reference: SRC-0771 · Regulatory record · Recorded authority: Official primary
Source URL
https://www.rtoinsider.com/wp-content/uploads/2026/06/FERC-ER26-2028-000-Crane-Eddystone-Waiver.pdf
https://www.rtoinsider.com/wp-content/uploads/2026/06/FERC-ER26-2028-000-Crane-Eddystone-Waiver.pdf
- Crane Clean Energy Center license-amendment applications
U.S. Nuclear Regulatory Commission / Federal Register · Document date: Feb 24, 2026 · Corroborating
Source reference: SRC-0769 · Regulatory record · Recorded authority: Official primary
Source URL
https://www.federalregister.gov/documents/2026/02/24/2026-03626/constellation-energy-generation-llc-christopher-m-crane-clean-energy-center-applications-for
https://www.federalregister.gov/documents/2026/02/24/2026-03626/constellation-energy-generation-llc-christopher-m-crane-clean-energy-center-applications-for
- Energy Department closes loan to restart Pennsylvania nuclear plant
U.S. Department of Energy · Document date: Nov 19, 2025 · Corroborating
Source reference: SRC-0768 · Government record · Recorded authority: Official primary
Source URL
https://www.energy.gov/articles/energy-department-closes-loan-restart-nuclear-power-plant-pennsylvania
https://www.energy.gov/articles/energy-department-closes-loan-restart-nuclear-power-plant-pennsylvania
- Constellation commits to Pennsylvania energy investments
Constellation Energy · Document date: Jul 15, 2025 · Corroborating
Source reference: SRC-0767 · Company announcement · Recorded authority: Party primary
Source URL
https://www.constellationenergy.com/news/2025/constellation-commits-to-billions-of-dollars-in-energy-investments-at-inaugural-pennsylvania-energy-and-innovation-summit.html
https://www.constellationenergy.com/news/2025/constellation-commits-to-billions-of-dollars-in-energy-investments-at-inaugural-pennsylvania-energy-and-innovation-summit.html
- Constellation to launch Crane Clean Energy Center
Constellation Energy · Document date: Sep 20, 2024 · Primary
Source reference: SRC-0766 · Company announcement · Recorded authority: Party primary
Source URL
https://www.constellationenergy.com/news/2024/Constellation-to-Launch-Crane-Clean-Energy-Center-Restoring-Jobs-and-Carbon-Free-Power-to-The-Grid.html
https://www.constellationenergy.com/news/2024/Constellation-to-Launch-Crane-Clean-Energy-Center-Restoring-Jobs-and-Carbon-Free-Power-to-The-Grid.html
- Crane Clean Energy Center current project page
Constellation Energy · Document date: Not stated · Corroborating
Source reference: SRC-0773 · Company announcement · Recorded authority: Party primary
Source URL
https://www.constellationenergy.com/about/locations/crane-clean-energy-center.html
https://www.constellationenergy.com/about/locations/crane-clean-energy-center.html
- Crane restart project
U.S. Department of Energy · Document date: Not stated · Corroborating
Source reference: SRC-0774 · Government record · Recorded authority: Official primary
Source URL
https://www.energy.gov/edf/crane-restart
https://www.energy.gov/edf/crane-restart
PPA term · 20 years
Source report · Christopher M. Crane Clean Energy Center Restart (Project)
Claim 12718 · Recorded claim type: Not stated · Review: Approved · Claim date: Not stated
- Constellation to launch Crane Clean Energy Center
Constellation Energy · Document date: Sep 20, 2024 · Primary
Source reference: SRC-0766 · Company announcement · Recorded authority: Party primary
Source URL
https://www.constellationenergy.com/news/2024/Constellation-to-Launch-Crane-Clean-Energy-Center-Restoring-Jobs-and-Carbon-Free-Power-to-The-Grid.html
https://www.constellationenergy.com/news/2024/Constellation-to-Launch-Crane-Clean-Energy-Center-Restoring-Jobs-and-Carbon-Free-Power-to-The-Grid.html
Doe guaranteed loan · $1,000,000,000
Source report · Christopher M. Crane Clean Energy Center Restart (Project)
Claim 12719 · Recorded claim type: Not stated · Review: Approved · Claim date: Not stated
- Energy Department closes loan to restart Pennsylvania nuclear plant
U.S. Department of Energy · Document date: Nov 19, 2025 · Primary
Source reference: SRC-0768 · Government record · Recorded authority: Official primary
Source URL
https://www.energy.gov/articles/energy-department-closes-loan-restart-nuclear-power-plant-pennsylvania
https://www.energy.gov/articles/energy-department-closes-loan-restart-nuclear-power-plant-pennsylvania
- Crane restart project
U.S. Department of Energy · Document date: Not stated · Corroborating
Source reference: SRC-0774 · Government record · Recorded authority: Official primary
Source URL
https://www.energy.gov/edf/crane-restart
https://www.energy.gov/edf/crane-restart
Restart cost estimate · $1,600,000,000
Source report · Christopher M. Crane Clean Energy Center Restart (Project)
Claim 12720 · Recorded claim type: Not stated · Review: Approved · Claim date: Not stated
- FERC waiver advances Three Mile Island restart
Utility Dive · Document date: Jun 3, 2026 · Primary
Source reference: SRC-0772 · News report · Recorded authority: Secondary
Source URL
https://www.utilitydive.com/news/constellation-three-mile-island-crane-nuclear-ferc-waiver/821836/
https://www.utilitydive.com/news/constellation-three-mile-island-crane-nuclear-ferc-waiver/821836/
Transferred interconnection rights · 760 MW
Source report · Christopher M. Crane Clean Energy Center Restart (Project)
Claim 12721 · Recorded claim type: Not stated · Review: Approved · Claim date: Not stated
- FERC waiver advances Three Mile Island restart
Utility Dive · Document date: Jun 3, 2026 · Corroborating
Source reference: SRC-0772 · News report · Recorded authority: Secondary
Source URL
https://www.utilitydive.com/news/constellation-three-mile-island-crane-nuclear-ferc-waiver/821836/
https://www.utilitydive.com/news/constellation-three-mile-island-crane-nuclear-ferc-waiver/821836/
- FERC order granting interconnection waiver for Crane
Federal Energy Regulatory Commission · Document date: Jun 1, 2026 · Primary
Source reference: SRC-0771 · Regulatory record · Recorded authority: Official primary
Source URL
https://www.rtoinsider.com/wp-content/uploads/2026/06/FERC-ER26-2028-000-Crane-Eddystone-Waiver.pdf
https://www.rtoinsider.com/wp-content/uploads/2026/06/FERC-ER26-2028-000-Crane-Eddystone-Waiver.pdf
Target commercial generation year · 2027
Actual · Christopher M. Crane Clean Energy Center Restart (Project)
Claim 12722 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- FERC waiver advances Three Mile Island restart
Utility Dive · Document date: Jun 3, 2026 · Corroborating
Source reference: SRC-0772 · News report · Recorded authority: Secondary
Source URL
https://www.utilitydive.com/news/constellation-three-mile-island-crane-nuclear-ferc-waiver/821836/
https://www.utilitydive.com/news/constellation-three-mile-island-crane-nuclear-ferc-waiver/821836/
- Constellation commits to Pennsylvania energy investments
Constellation Energy · Document date: Jul 15, 2025 · Primary
Source reference: SRC-0767 · Company announcement · Recorded authority: Party primary
Source URL
https://www.constellationenergy.com/news/2025/constellation-commits-to-billions-of-dollars-in-energy-investments-at-inaugural-pennsylvania-energy-and-innovation-summit.html
https://www.constellationenergy.com/news/2025/constellation-commits-to-billions-of-dollars-in-energy-investments-at-inaugural-pennsylvania-energy-and-innovation-summit.html
Construction jobs · 3,400 jobs
Source report · Christopher M. Crane Clean Energy Center Restart (Project)
Claim 12724 · Recorded claim type: Not stated · Review: Approved · Claim date: Not stated
- Constellation to launch Crane Clean Energy Center
Constellation Energy · Document date: Sep 20, 2024 · Primary
Source reference: SRC-0766 · Company announcement · Recorded authority: Party primary
Source URL
https://www.constellationenergy.com/news/2024/Constellation-to-Launch-Crane-Clean-Energy-Center-Restoring-Jobs-and-Carbon-Free-Power-to-The-Grid.html
https://www.constellationenergy.com/news/2024/Constellation-to-Launch-Crane-Clean-Energy-Center-Restoring-Jobs-and-Carbon-Free-Power-to-The-Grid.html
- Crane Clean Energy Center current project page
Constellation Energy · Document date: Not stated · Corroborating
Source reference: SRC-0773 · Company announcement · Recorded authority: Party primary
Source URL
https://www.constellationenergy.com/about/locations/crane-clean-energy-center.html
https://www.constellationenergy.com/about/locations/crane-clean-energy-center.html
Nrc restart approval · Pending
Actual · Christopher M. Crane Clean Energy Center Restart (Project)
Claim 12725 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated
- NRC public meeting on possible Crane restart
U.S. Nuclear Regulatory Commission · Document date: Jul 14, 2026 · Corroborating
Source reference: SRC-0770 · Government record · Recorded authority: Official primary
Source URL
https://www.nrc.gov/sites/default/files/cdn/doc-collection-news/2026/26-019-i-a.pdf
https://www.nrc.gov/sites/default/files/cdn/doc-collection-news/2026/26-019-i-a.pdf
- Crane Clean Energy Center license-amendment applications
U.S. Nuclear Regulatory Commission / Federal Register · Document date: Feb 24, 2026 · Primary
Source reference: SRC-0769 · Regulatory record · Recorded authority: Official primary
Source URL
https://www.federalregister.gov/documents/2026/02/24/2026-03626/constellation-energy-generation-llc-christopher-m-crane-clean-energy-center-applications-for
https://www.federalregister.gov/documents/2026/02/24/2026-03626/constellation-energy-generation-llc-christopher-m-crane-clean-energy-center-applications-for
Counterparties and capital
Constellation Energy Generation, LLC · Owner · CMP-0418
Federal Energy Regulatory Commission · Government authority · CMP-0422
Federal Financing Bank · Lender · CMP-0420
Microsoft · Customer · CMP-0017
PJM Interconnection · Utility provider · CMP-0423
U.S. Department of Energy, Energy Dominance Financing · Government authority · CMP-0419
U.S. Nuclear Regulatory Commission · Government authority · CMP-0421
$1,000,000,000 · Nov 18, 2025
Federal Financing Bank loan guaranteed through DOE program; partially finances restart.
Constellation Energy Generation, LLC (Borrower) · Federal Financing Bank (Lender) · U.S. Department of Energy, Energy Dominance Financing (Other)
Sources (2)
Financing record 54; claim-specific source links appear in the exhibit sources where published.
$1,600,000,000 · Jun 3, 2026
Reported restart-cost estimate; not an executed debt or equity facility.
Counterparties not specified.
Sources (1)
- FERC waiver advances Three Mile Island restart · Jun 3, 2026
Financing record 55; claim-specific source links appear in the exhibit sources where published.
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.