Colt Tokyo Yoshikawa Data Centre
- Planned critical IT
- 80 MW
- Updated
- Oct 28, 2026
Colt’s Yoshikawa project is a two-building, 9.5-acre Saitama development designed for 80 MW once fully operational. The first-building and second-building records remain phases of this campus, not separate Cartis projects. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Colt’s Yoshikawa project is a two-building, 9.5-acre Saitama development designed for 80 MW once fully operational. The first-building and second-building records remain phases of this campus, not separate Cartis projects. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Milestones (1)
2030 · Forecast / planned record
Forecast · Forecast completion
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Colt Tokyo Yoshikawa Data Centre official profile · Aug 28, 2026 · Primary
Site & development
Additional project facts
Capacity basis
ActualColt Data Centre Services publishes 80 MW of IT power for this project boundary.
SourceCapacity basis
Actual80 MW is the published future facility or full build IT boundary; it is not operating load.
SourceCapacity basis
Actual80 MW is the published future facility or full build IT boundary; it is not operating load.
SourceIdentity boundary
ActualThis facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
SourceInfrastructure & permits
Technical details (3)
Planned or represented
80 MW
80 MW is the published future facility or full-build IT boundary; it is not operating load.
Planned or represented
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Planned or represented
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.