Scope and capacity

Colt Paris South West Data Centre is tracked as its own facility within Colt’s Paris platform. The profile separates the 120 MW site power contract from facility IT capacity and retains the operator-published individual facility boundary. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Headline: 24 MW Planned critical IT

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Jump to a claim (16)

Location context · Colt Paris South West | Les Ulis | Île de-France | FR

Actual · Colt Paris South West Data Centre (Project)

Claim 66549 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Lifecycle status · Operating

Actual · Colt Paris South West Data Centre (Project)

Claim 66550 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Reported capacity · 24 MW

Design · Colt Paris South West Data Centre (Project)

Claim 66551 · Recorded claim type: Design · Review: Approved · Claim date: Not stated

Headline treatment: Selected headline

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Capacity basis · Colt Data Centre Services publishes 24 MW of IT power for this project boundary.

Actual · Colt Paris South West Data Centre (Project)

Claim 66552 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Location context · Colt Paris South West | Les Ulis | Île de-France | FR

Actual · Colt Paris South West Data Centre (Project)

Claim 84664 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Lifecycle status · Operating

Actual · Colt Paris South West Data Centre (Project)

Claim 84665 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Reported capacity · 24 MW

Design · Colt Paris South West Data Centre (Project)

Claim 84666 · Recorded claim type: Design · Review: Approved · Claim date: Not stated

Headline treatment: Separate claim, not added to the headline

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Capacity basis · 24 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Actual · Colt Paris South West Data Centre (Project)

Claim 84667 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Operator confirmed · Colt Data Centre Services

Actual · Colt Paris South West Data Centre (Project)

Claim 84668 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Project location · Les Ulis, Île de-France, FR

Actual · Colt Paris South West Data Centre (Project)

Claim 84669 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Current lifecycle · Operating

Actual · Colt Paris South West Data Centre (Project)

Claim 84670 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Capacity classification · It load

Actual · Colt Paris South West Data Centre (Project)

Claim 84671 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Capacity basis · 24 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Actual · Colt Paris South West Data Centre (Project)

Claim 84672 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Customer utilization · Not publicly disclosed

Actual · Colt Paris South West Data Centre (Project)

Claim 84673 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Identity boundary · This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios

Actual · Colt Paris South West Data Centre (Project)

Claim 84674 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt DCS Paris campus development analysis

    Data Center Dynamics · Document date: Apr 9, 2025 · Primary

    Source reference: SRC-4757 · News report · Recorded authority: Secondary

    Source URL

    https://www.datacenterdynamics.com/en/analysis/colt-romances-hyperscalers-in-paris/

Source refresh date · 2026-08-29

Actual · Colt Paris South West Data Centre (Project)

Claim 84675 · Recorded claim type: Actual · Review: Approved · Claim date: Not stated

  1. Colt Paris South West Data Centre official profile

    Colt Data Centre Services · Document date: Aug 28, 2026 · Primary

    Source reference: SRC-3782 · Fact sheet · Recorded authority: Official primary

    Source URL

    https://www.coltdatacentres.net/en-GB/our-locations/data-centre-locations-europe/paris-south-west

Counterparties and capital

Colt Data Centre Services · Developer · CMP-1483

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.