Colt Paris 2 Data Centre
- Planned critical IT
- 40 MW
- Updated
- Oct 28, 2026
Colt Paris 2 Data Centre is tracked as its own facility within Colt’s Paris platform. The profile separates the 120 MW site power contract from facility IT capacity and retains the operator-published individual facility boundary. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Colt Paris 2 Data Centre is tracked as its own facility within Colt’s Paris platform. The profile separates the 120 MW site power contract from facility IT capacity and retains the operator-published individual facility boundary. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Milestones (1)
2024 · Recorded actual event
Completed · Construction started
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Colt Paris 2 Data Centre official profile · Aug 28, 2026 · Primary
Capital & incentives
Capital claims and financing records may overlap. Their amounts are not added together.
Capital claims
Financing records
Investment commitment
€400,000,000Jan 1, 2024
Reported Paris 2 development investment; not attributed as third-party project debt.
Parties & sources
Colt Data Centre Services (Borrower)
Sources (1)
- Colt DCS Paris campus development analysis · Apr 9, 2025
Site & development
Additional project facts
Capacity basis
ActualColt Data Centre Services publishes 40 MW of IT power for this project boundary.
SourceCapacity basis
Actual40 MW is the published future facility or full build IT boundary; it is not operating load.
SourceCapacity basis
Actual40 MW is the published future facility or full build IT boundary; it is not operating load.
SourceIdentity boundary
ActualThis facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
SourceInfrastructure & permits
Technical details (3)
Planned or represented
40 MW
40 MW is the published future facility or full-build IT boundary; it is not operating load.
Planned or represented
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Planned or represented
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Preconstruction · Villebon-sur-Yvette, Île-de-France, France
Same locality: Villebon-sur-Yvette · Shared participant: Colt Data Centre Services
Compare in a collectionPreconstruction · Villebon-sur-Yvette, Île-de-France, France
Same locality: Villebon-sur-Yvette · Shared participant: Colt Data Centre Services
Compare in a collectionPreconstruction · Les Ulis, Île-de-France, France
Shared participant: Colt Data Centre Services · Same market: Île-de-France, France
Compare in a collectionOperating · Les Ulis, Île-de-France, France
Shared participant: Colt Data Centre Services · Same market: Île-de-France, France
Compare in a collection