CloudHQ MSP Campus
- Planned critical IT
- 200 MW
- Updated
- Oct 29, 2026
CloudHQ MSP Campus. 2007 Schoolmaster Drive, West Creek Corporate Center. Operator coordinates 44.81068,-93.63557. Up to 200 MW planned critical IT in one or two buildings; no operational capacity established. Planned, preliminary approval only. City says no final site-plan/plat application submitted and no final review timeline. On-site substation would connect directly to Xcel transmission, not Chaska distribution. System-impact study remains a stated condition. Air-based chillers proposed; anticipated annual water use 14 million gallons, not a measured operating figure. Private concrete-encased ducts to telecommunications providers. Adjacent Stream/UnitedHealth sites are separate campuses. City reports no tax relief applied for or offered; campus financing not disclosed in reviewed sources. Exact current operating load and unverified legal or financial details remain unknown.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Milestones (4)
Aug 15, 2022 · Recorded actual event
Completed · Announced
Sources (1)
- Cloud HQ · Primary
Jan 9, 2023 · Recorded actual event
Completed · Announced
Sources (1)
- Cloud HQ · Primary
Oct 16, 2023 · Recorded actual event
Completed · Announced
Sources (1)
- Cloud HQ · Primary
Oct 21, 2024 · Recorded actual event
Completed · Announced
Sources (1)
- Cloud HQ · Primary
Participants
Site & development
Site location
Reported rounded2007 Schoolmaster Drive, West Creek Corporate Center. Operator coordinates 44.81068,-93.63557.
SourceReviewed msp area context
Source reportCloudHQ advertises 1.1 million sq ft; Chaska describes approximately 1.5 million sq ft. Measurement bases and design versions remain unreconciled; neither establishes completed or occupied IT space.
SourceAdditional project facts
Reviewed msp auar scope context
Source reportThe 2022 Kelzer AUAR order and attached June scoping document identify a 72.3-acre study area comprising parcels 300311090 and 300311010. The order called for evaluation of 500,000-sq ft and 1.8-million sq ft industrial scenarios; neither establishes selected final campus design or current title. This is an order for review, not final environmental approval.
SourceReviewed msp screening context
Source reportThe city describes a 300-foot separation between existing residences and project parking, plus an approximately 30-foot berm on the north and east to precede building completion. These are proposed provisions, not verified completed works.
SourceInfrastructure & permits
Technical details (4)
Reported context
On-site substation would connect directly to Xcel transmission, not Chaska distribution. System-impact study remains a stated condition.
Reported context
Air-based chillers proposed; anticipated annual water use 14 million gallons, not a measured operating figure.
Reported context
Private concrete-encased ducts to telecommunications providers. Adjacent Stream/UnitedHealth sites are separate campuses.
Reported context
City describes anticipated 14 million gallons annual water use; proposed, not measured.
Project map
Other · Documented
CloudHQ MSP Campus
Sources (1)
- Cloud HQ · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.