CloudHQ FRA Campus Offenbach
- Planned critical IT
- 112 MW
- Updated
- Oct 29, 2026
CloudHQ’s FRA campus occupies former Manroland land at Lämmerspieler Weg in Offenbach. Its two-building design totals 112 MW of critical IT capacity, distinct from the city’s historical 172 MW connection figure. The operator reports service from 2023; a November–December 2025 interview described one operating building and forecast the second for 2026, without establishing current full-campus commissioning. Infrastructure includes a dedicated 110 kV substation and diverse fiber ducts. Municipal sources describe roughly 14.5–15 hectares, and the operator reports both buildings permitted. The separate Kettelerstraße development is excluded.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Milestones (2)
Oct 9, 2020 · Recorded actual event
Completed · Announced
Sources (1)
- Municipal campus announcement · Oct 9, 2020 · Primary
2023 · Recorded actual event
Completed · Announced
Sources (1)
- CloudHQ official campus profile · Primary
Participants
Developer · Operator
Sources by role
Developer / Operator (1)
- CloudHQ official campus profile · Primary
Site & development
Site location
Reported roundedTwo building campus on former Manroland land at Lämmerspieler Weg, An den Eichen. Operator coordinates 50.10932, 8.80648. Municipal acquisition announcement specifies 14.5 hectares; later municipal construction release rounds to 15 hectares. Exclude separate CloudHQ Kettelerstraße 100 / Mühlheimer Straße 164 development.
SourceLand and site control context
Reported rounded14.5 Hectares acquired from Manroland per municipality. Operator’s 108,371 m² figure is presented without clear land versus building label; do not overwrite land area with it.
SourceReviewed fra construction team context
Reported roundedThe May 12, 2021 municipal release reported completion of first building foundations in early April 2021 and the start of above ground construction, identifying Adolf Lupp GmbH as the construction company. Its anticipated 2022 opening remains a historical forecast.
SourceAdditional project facts
Reviewed fra phase status context
Reported roundedThe November–December 2025 IHK interview reported one CloudHQ data centre operating in Offenbach and forecast completion of a second in 2026. Its discussion identifies the Lämmerspieler Weg property separately from the proposed Kettelerstraße project. This does not establish that the second building is now complete or that all 112 MW is operational.
SourceReviewed fra utility context
Reported roundedThe city’s May 12, 2021 release distinguished approximately 112 MW of two building IT design from 172 MW connection capacity and described EVO supply through an onsite substation for the first building. These are historical design and intended supply descriptions, not measured demand.
SourceInfrastructure & permits
Technical details (2)
Reported context
New on-site 110 kV substation serves the campus.
Reported context
Diverse fiber ducts connect to two interconnection points.
Project map
Other · Documented
CloudHQ FRA Campus Offenbach
Sources (1)
- CloudHQ official campus profile · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.