CDC Laverton Campus

Laverton, Victoria, AustraliaUnder construction
Evidence
Planned / design
400 MW
Updated
Oct 29, 2026

CDC’s Laverton campus in Melbourne is under construction, with more than 400 MW of planned capacity on the operator’s directory; the electrical basis is not specified as IT load. In its 16 September 2026 presentation, CDC expected the first building to operate in late FY27 and buildings 2 and 3 across FY28. These are forecasts, not completed or energized capacity. The February 2025 announcement’s 150 MW figure is a separate dated scope. Its advertised economic contribution is not campus capex. Operating load, precise parcel ownership and campus-specific financing remain unverified.

Capacity

Reported campus capacity MW

Planned / design or future potential

400 MW

Source

Historical announced campus capacity MW

Planned / design or future potential

150 MW

Source

Reported capacity under construction MW

Planned / design or future potential

100 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Milestones (2)
Groundbreaking and commencement of works.

Feb 17, 2025 · Recorded actual event

Completed · Announced

Sources (1)
Reporting as of March 31, 2026 (not an exact construction commencement date): Quarter-end investor reporting records commencement of over 100 MW of built capacity.

Mar 31, 2026 · Recorded actual event

Completed · Announced

Sources (1)

Participants

CDC Data Centres

Developer · Operator

Sources by role
Developer / Operator (1)
Developer / Operator (1)

Site & development

Site location

Reported rounded

Laverton North, Melbourne, Victoria. Exact street address is not primary verified in this pass. Secondary leads identify 20–38 Leakes Road, but the linked Wyndham permit portal returned 403; omit that street address from publication until verified.

Source

Reviewed dated building delivery outlook

Actual

In its 16 September 2026 investor presentation, CDC forecast that Laverton’s first building would become operational in late FY27, followed by buildings 2 and 3 across FY28. These are conditional delivery expectations, not evidence of completion, energization or operating capacity. The presentation’s separate 30 June 2026 campus snapshot marks LA1, LA2 and LA3 as under construction.

Source

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
CDC Brooklyn Campus

Partially operational · Brooklyn, Victoria, Australia

Shared participant: CDC Data Centres · Same market: Victoria, Australia

Compare in a collection