Skip to content

Bulk N01 Data Center Campus

Kristiansand, Agder, NorwayPartially operational
Evidence
Utility capacity
300 MW
Updated
Oct 28, 2026
Utility
Glitre Nett

Bulk announced an IKT Agder service agreement on May 5, 2026. Its third-quarter 2026 reporting continued to describe facility construction and plot preparation at N01, without establishing a new completed MW total. Bulk Infrastructure operates and is expanding its N01 campus near Kristiansand, Norway. Bulk described a 42 MW building under construction and a utility collaboration intended to add 300 MW of power capacity, with longer-term campus potential above 1 GW. Hydroelectric-rich Nordic grid access and planned expansion of regional power capacity.

Capacity

Reported capacity

Proposal

300 MW

Source

Capacity

Proposal

300 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating campus and expansionPartially operational

Bulk N01 Data Center Campus: Operating with expansion underway.

Milestones (2)
Bulk N01 Data Center Campus: Operating campus with expansion construction and 300 MW additional power pathway.

Nov 6, 2024 · Event timing type not established

In progress · Construction started

Source not linked
Bulk N01 Data Center Campus — Operating with expansion underway

Date not disclosed · Event timing type not established

In progress · Status changed

Source not linked

Participants

Other participants (1)
Glitre Nett

Utility provider

Sources by role

Site & development

Location context

Actual

Bulk N01 campus | Vennesla / Kristiansand region | Norway

Source

Location

Actual

Kristiansand, Agder, NO

Source

Development scale

Actual

Operating and expanding campus; 42 MW expansion building

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

Source stated additional utility power capacity under collaboration; not current IT load

Source

Project identity

Actual

Bulk N01 Data Center Campus

Source

Lifecycle status

Actual

Operating with expansion underway

Source

Participant roles

Actual

Bulk Infrastructure, Glitre Nett

Source

Capacity basis

Actual

300 MW grid or utility service capacity

Source

Infrastructure

Actual

Hydroelectric rich Nordic grid access and planned expansion of regional power capacity.

Source

Infrastructure & permits

Technical details (2)
Utility service

Partially operational

300 MW

300 MW grid or utility-service capacity

Site facility

Partially operational

Hydroelectric-rich Nordic grid access and planned expansion of regional power capacity.

Interconnection · Issued

Bulk N01 Data Center Campus

Norwegian Water Resources and Energy Directorate

Jan 1, 2025

Sources (2)