Hilliard, Ohio, United StatesOperating / Stabilized
Capacity
No public figure
Lead participant
Ohio Power Company (AEP Ohio)
Utility Provider
Last updated
Sep 1, 2026
Most recent public record update

About AWS Hilliard Scioto Darby Road Campus

AWS operates multiple data center buildings on a 142-acre campus along Scioto Darby Creek Road in Hilliard. AEP Ohio reports 328 MW of current electric load for the campus and plans a temporary 72.9 MW behind-the-meter fuel-cell plant to support additional buildings while transmission capacity is expanded. The city’s tax agreement required at least $200 million of investment and provides school payments tied to completed building area.

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

2 phases · 2 milestones
Operating campus buildingsOperational

Multiple AWS data center buildings in service.

Additional campus buildings and temporary fuel-cell supplyUnder Construction

Latest data center building under construction; 72.9 MW fuel-cell system targeted for September 2027.

Sep 22, 2025
Ohio Power Siting Board approved the 72.9 MW fuel-cell project
Completed
Sep 30, 2027
Fuel-cell system targeted for operation
Forecast

Infrastructure

Electric GridOperational

328 MW

AEP Ohio reports 328 MW of current campus electric load.

Onsite GenerationPlanned Or Represented

72.9 MW

Behind-the-meter solid oxide fuel-cell system planned as temporary supply.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 1Generation & storage: 1

Facts & sources

Published claims and their source links.

2 facts
Site Area
142 acre
Actual
Planned Building Area
2,000,000 sq. ft.
Actual