AWS Energy Way Tech Campus
About AWS Energy Way Tech Campus
AWS is constructing the Energy Way Tech Campus near Hamlet, North Carolina, while state regulators review major-source air permits for its emergency generators and Duke Energy's temporary bridge-power facility. Participants include Amazon Data Services, Inc. as developer, Duke Energy Progress as utility provider. Development comprises Site preparation and campus construction (construction), Temporary bridge power (preconstruction). Key milestones include Draft Title V public-comment period closes. (2026-07-31) and Steel construction observed at Energy Way. (2026-08-04). permanent electric grid service: Permanent Duke service is being developed; service date and contracted campus load remain undisclosed. temporary bridge power — 57 diesel_engines: Separate Duke facility at 1761 Airport Road; planned retirement within one year after operation begins. Permitting includes title v air quality for Amazon Data Services Energy Way Tech Campus (draft preliminary determination comment closed) and title v air quality for Duke Energy Progress temporary bridge-power facility (draft preliminary determination comment closed). Incentives include performance grant building property tax (approved reported terms) for Reported grant equal to 50% of building property taxes, conditioned on project performance. and performance grant machinery equipment tax (approved reported terms) for Reported grant equal to 65% of machinery/equipment taxes; agreement reportedly requires at least $1B investment and 50 jobs by 2030.
Capacity
No additional capacity claims are published.
Development
2 phases · 5 milestonesCurrent air-permit design; initial county announcement described 20 buildings.
21 buildings
Duke's 57-engine facility is infrastructure and must retire within one year of operation.
Infrastructure
Permanent Duke service is being developed; service date and contracted campus load remain undisclosed.
57 diesel engines
Separate Duke facility at 1761 Airport Road; planned retirement within one year after operation begins.
588 diesel engines
AWS emergency engines at 198 Energy Way; generator nameplate must not be used as campus IT or grid capacity.
County-owned improvements support the site; usage, cooling design and completion status remain open.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.