AWS Energy Way Tech Campus

Hamlet, North Carolina, United StatesUnder construction
Capacity
No public figure
Lead participant
Amazon Data Services, Inc.
Developer
Last updated
Aug 24, 2026
Most recent public record update

About AWS Energy Way Tech Campus

AWS is constructing the Energy Way Tech Campus near Hamlet, North Carolina, while state regulators review major-source air permits for its emergency generators and Duke Energy's temporary bridge-power facility. Participants include Amazon Data Services, Inc. as developer, Duke Energy Progress as utility provider. Development comprises Site preparation and campus construction (construction), Temporary bridge power (preconstruction). Key milestones include Draft Title V public-comment period closes. (2026-07-31) and Steel construction observed at Energy Way. (2026-08-04). permanent electric grid service: Permanent Duke service is being developed; service date and contracted campus load remain undisclosed. temporary bridge power — 57 diesel_engines: Separate Duke facility at 1761 Airport Road; planned retirement within one year after operation begins. Permitting includes title v air quality for Amazon Data Services Energy Way Tech Campus (draft preliminary determination comment closed) and title v air quality for Duke Energy Progress temporary bridge-power facility (draft preliminary determination comment closed). Incentives include performance grant building property tax (approved reported terms) for Reported grant equal to 50% of building property taxes, conditioned on project performance. and performance grant machinery equipment tax (approved reported terms) for Reported grant equal to 65% of machinery/equipment taxes; agreement reportedly requires at least $1B investment and 50 jobs by 2030.

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

2 phases · 5 milestones
Site preparation and campus constructionUnder Construction

Current air-permit design; initial county announcement described 20 buildings.

21 buildings

Temporary bridge powerAnnounced Or Preconstruction

Duke's 57-engine facility is infrastructure and must retire within one year of operation.

Jun 4, 2025
AWS and North Carolina announce $10B Richmond County plan
Completed
Dec 31, 2025
County expected site preparation by end of 2025
Forecast
Jun 26, 2026
DEQ announces joint Amazon/Duke draft-permit hearing
Completed
Jul 31, 2026
Draft Title V public-comment period closes
Completed
Aug 4, 2026
Steel construction observed at Energy Way
Completed

Infrastructure

Electric GridUnder Construction

Permanent Duke service is being developed; service date and contracted campus load remain undisclosed.

Onsite GenerationPlanned Or Represented

57 diesel engines

Separate Duke facility at 1761 Airport Road; planned retirement within one year after operation begins.

Onsite GenerationPlanned Or Represented

588 diesel engines

AWS emergency engines at 198 Energy Way; generator nameplate must not be used as campus IT or grid capacity.

Utility ServicePlanned Or Represented

County-owned improvements support the site; usage, cooling design and completion status remain open.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 2Generation & storage: 2

Facts & sources

Published claims and their source links.

7 facts
Announced Investment
$10 billions
Actual
Permanent Job Target
500 jobs
Actual
Marketed Site Area
800 acres
Reported Rounded
Building Count
21
Actual
Emergency Engine Count
588 diesel engines
Actual
Temporary Bridge Engine Count
57 diesel engines
Actual
Construction Status
Steel structures observed under construction