atNorth SWE01 Stockholm Data Center Campus

Kista, Stockholm County, SwedenPartially operational
Capacity
12 MW
Planned / design
Lead participant
atNorth
Developer
Last updated
Aug 28, 2026
Most recent public record update

About atNorth SWE01 Stockholm Data Center Campus

atNorth SWE01 Stockholm Data Center Campus, also known as atNorth SWE01, is a data center project in Kista, Stockholm County, SE associated with atNorth. 6,400-square-metre facility; 12 MW published site power capacity; operating high-density metro site. Renewable-energy Stockholm campus with direct liquid cooling and district heat recovery.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential12 MWDesign · atNorth SWE01 Stockholm Data Center Campus
Design12 MWDesign · atNorth SWE01 Stockholm Data Center Campus

Development

1 phases · 2 milestones
Operating facility and documented expansionPartially Operational

12 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Current source record reviewed for atNorth SWE01
Completed
Aug 30, 2026
Operating boundary reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Renewable-energy Stockholm campus with direct liquid cooling and district heat recovery.

Cooling SystemOperational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
AtNorth SWE01 | Kista | Stockholm County | SE
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
12 MW
Design
Capacity Basis
AtNorth publishes 12 MW of site power capacity for SWE01; Cartis does not equate it with measured IT load.
Actual
Location Context
AtNorth SWE01 | Kista | Stockholm County | SE
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
12 MW
Design
Capacity Basis
12 MW facility or campus design capacity.
Actual
Project Identity
AtNorth SWE01
Actual
Location Context
Kista, Stockholm County, SE
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
6,400-Square metre facility; 12 MW published site power capacity; operating high density metro site.
Actual
Capacity Basis
12 MW facility or campus design capacity.
Actual