atNorth Solleftea SWE04 Mega Campus

Langsele, Solleftea, Vasternorrland, SwedenPreconstruction
Capacity
300 MW
Planned / design
Lead participant
atNorth
Developer · Operator
Last updated
Aug 25, 2026
Most recent public record update

About atNorth Solleftea SWE04 Mega Campus

atNorth plans a 300 MW mega campus at the fully zoned Hamre 1 site in Langsele, targeting H1 2028. atNorth Solleftea SWE04 Mega Campus is located in Langsele, Solleftea, Vasternorrland, SE and is a data center campus in preconstruction status. Participants include atNorth as developer, atNorth as operator, Solleftea Municipality as landowner. Published specifications include 300 MW of planned capacity. Development comprises Original initial concept (proposed), SWE04 campus buildout (proposed). Key milestones include atNorth confirmed SWE04 plan (2026-02-23) and Campus targeted for H1 2028 (2028-H1). heat reuse: atNorth will pursue local heat-reuse partnerships; none is disclosed as contracted or operating. Permitting includes detailed development plan / zoning for SWE04 / Hamre 1 (final).

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential300 MWActual · atNorth Solleftea SWE04 Mega Campus

Development

2 phases · 4 milestones
Original initial conceptAnnounced Or Preconstruction

Superseded by 2026 300 MW / 50-hectare disclosure.

SWE04 campus buildoutAnnounced Or Preconstruction

Site-power envelope; committed construction phases are undisclosed.

Dec 16, 2024
atNorth announced initial Solleftea land agreement
Completed
Jan 1, 2026
Municipality reports signed purchase agreement and final detailed plan
Completed
Feb 23, 2026
atNorth confirmed SWE04 plan
Completed
Jan 1, 2028
Campus targeted for H1 2028
Forecast

Infrastructure

Electric GridPlanned Or Represented
Heat ReusePlanned Or Represented

atNorth will pursue local heat-reuse partnerships; none is disclosed as contracted or operating.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

12 facts
Current Site Area Approximately
50 hectares
Actual
Planned Site Power Capacity
300 MW
Actual
Target Operational Period
H1 2028
Actual
Land Purchase Agreement Signed
True
Actual
Detailed Plan Final
True
Actual
Land Price
175 SEK million
Actual
Planned Direct Jobs Low
100 jobs
Actual
Planned Direct Jobs High
150 jobs
Actual
Design Pue
1.2
Actual
Renewable Energy Design
True
Actual
Direct Liquid Cooling Ready
True
Actual
Waste Heat Reuse Planned
True