atNorth Solleftea SWE04 Mega Campus
About atNorth Solleftea SWE04 Mega Campus
atNorth plans a 300 MW mega campus at the fully zoned Hamre 1 site in Langsele, targeting H1 2028. atNorth Solleftea SWE04 Mega Campus is located in Langsele, Solleftea, Vasternorrland, SE and is a data center campus in preconstruction status. Participants include atNorth as developer, atNorth as operator, Solleftea Municipality as landowner. Published specifications include 300 MW of planned capacity. Development comprises Original initial concept (proposed), SWE04 campus buildout (proposed). Key milestones include atNorth confirmed SWE04 plan (2026-02-23) and Campus targeted for H1 2028 (2028-H1). heat reuse: atNorth will pursue local heat-reuse partnerships; none is disclosed as contracted or operating. Permitting includes detailed development plan / zoning for SWE04 / Hamre 1 (final).
Capacity
Planned / designDevelopment
2 phases · 4 milestonesSuperseded by 2026 300 MW / 50-hectare disclosure.
Site-power envelope; committed construction phases are undisclosed.
Infrastructure
atNorth will pursue local heat-reuse partnerships; none is disclosed as contracted or operating.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.