atNorth ICE02 Keflavík Data Center Campus

Keflavík, Southern Peninsula, IcelandPartially operational
Evidence
Planned / design
83 MW
Updated
Oct 28, 2026

An August 26, 2025 announcement added a 24 MW Crusoe expansion agreement at atNorth ICE02, taking the announced customer footprint from 33 MW to 57 MW. The agreement does not establish that every expansion hall was completed on signing or replace the full-campus design capacity. atNorth ICE02 Keflavík Data Center Campus, also known as atNorth ICE02, is a data center project in Keflavík, Southern Peninsula, IS associated with atNorth. Nine-hectare Tier 3 campus; 83 MW published campus power capacity; PUE at or below 1.2. Renewable geothermal and hydroelectric power, natural free cooling, liquid-cooling-ready halls and redundant subsea connectivity.

Capacity

Reported capacity

Planned / design or future potential

83 MW

Source

Reported capacity

Planned / design or future potential

83 MW

Source

Published campus capacity

Planned / design or future potential

83+ MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

83 MW is the operator-published facility or campus design boundary.

Milestones (2)
Initial ICE02 expansion phase entered operation

Sep 30, 2024 · Recorded actual event

Completed · Commercial operation

Source not linked
Later expansion target passed; phase-specific energization remains a follow-up

Jun 30, 2025 · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

atNorth

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

AtNorth ICE02 | Keflavík | Southern Peninsula | IS

Source

Location context

Actual

AtNorth ICE02 | Keflavík | Southern Peninsula | IS

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

AtNorth publishes 83 MW of campus power capacity; Cartis does not equate this value with measured IT load.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

83 MW facility or campus design capacity.

Source

Technical space

Design

13,750 square metres

Source

Infrastructure & permits

Technical details (2)
Electric grid

Energized

Renewable geothermal and hydroelectric power, natural free cooling, liquid-cooling-ready halls and redundant subsea connectivity.

Cooling system

Operational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Public-source research. Plans may change. See Evidence for sources and qualifications.