Data center siteSite record

atNorth FIN02 Helsinki Data Center Campus

Espoo, Uusimaa, FinlandPartially operational
Capacity
40 MW
Planned / design
Lead participant
atNorth
Developer
Last updated
Aug 28, 2026
Most recent public record update

About atNorth FIN02 Helsinki Data Center Campus

atNorth FIN02 Helsinki Data Center Campus, also known as atNorth FIN02, is a data center project in Espoo, Uusimaa, FI associated with atNorth. 20,048-square-metre campus; 40 MW published campus power capacity; high-density and liquid-cooling-ready. Renewable-energy Helsinki campus with N+2 fan-wall cooling and community heat reuse.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential40 MWDesign · atNorth FIN02 Helsinki Data Center Campus
Design40 MWDesign · atNorth FIN02 Helsinki Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionPartially Operational

40 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Mar 18, 2025
Heat-reuse partnership and Caruna agreement announced
Completed

Infrastructure

Electric GridEnergized

Renewable-energy Helsinki campus with N+2 fan-wall cooling and community heat reuse.

Cooling SystemOperational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Electric GridSecured Or Contracted

45 MW

Caruna power agreement is distinct from the 40 MW marketed campus power and from operating IT load.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Cooling & water: 1

Facts & sources

Published claims and their source links.

10 facts
Location Context
AtNorth FIN02 | Espoo | Uusimaa | FI
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
40 MW
Design
Capacity Basis
AtNorth publishes 40 MW of campus power capacity for FIN02; Cartis does not equate it with measured IT load.
Actual
Location Context
AtNorth FIN02 | Espoo | Uusimaa | FI
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
40 MW
Design
Capacity Basis
40 MW facility or campus design capacity.
Actual
Technical Area
20,048 square metres
Design
Nokia Contract Term
12 years
Actual