Data center siteSite record

atNorth DEN02 Oelgod Mega Campus

Oelgod, Varde Municipality, Region of Southern Denmark, DenmarkPreconstruction
Capacity
500 MW
Planned critical IT
Lead participant
atNorth
Developer · Operator
Last updated
Aug 25, 2026
Most recent public record update

About atNorth DEN02 Oelgod Mega Campus

atNorth markets DEN02 as a future 500 MW campus in Oelgod, with a 250 MW initial phase and planned heat reuse. atNorth DEN02 Oelgod Mega Campus is located in Oelgod, Varde Municipality, Region of Southern Denmark, DK and is a data center campus in preconstruction status. Participants include atNorth as developer, atNorth as operator, Oelgod Technical Works as utility. Published specifications include 250 MW of planned capacity, 500 MW of operating IT capacity. Development comprises DEN02 initial phase (proposed), DEN02 campus buildout (proposed). Key milestones include atNorth and Oelgod Technical Works advance heat-reuse plan (2025-10-15) and Earlier groundbreaking target passes without authoritative start confirmation (2026-03-31). district heat reuse: Letter of intent for future surplus-heat delivery; no operating heat flow or final commercial terms. greenhouse heat reuse: Collaboration contemplates large-scale greenhouses; implementation scope and service date remain open.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential250 MWActual · atNorth DEN02 Oelgod Mega Campus
It Load500 MWActual · atNorth DEN02 Oelgod Mega Campus

Development

2 phases · 3 milestones
DEN02 initial phaseAnnounced Or Preconstruction

Initial site-power plan; committed buildings and IT load undisclosed.

DEN02 campus buildoutAnnounced Or Preconstruction

Current site-page total; keep separate from the 250 MW initial phase and from the future-sites wording conflict.

Sep 4, 2024
atNorth announces Oelgod mega campus
Completed
Oct 15, 2025
atNorth and Oelgod Technical Works advance heat-reuse plan
Completed
Mar 31, 2026
Earlier groundbreaking target passes without authoritative start confirmation
Quarter

Infrastructure

Heat ReusePotential Or Planned

Letter of intent for future surplus-heat delivery; no operating heat flow or final commercial terms.

Heat ReuseSecured Or Contracted

Collaboration contemplates large-scale greenhouses; implementation scope and service date remain open.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Cooling & water: 2

Facts & sources

Published claims and their source links.

13 facts
Initial Planned Site Power
250 MW
Actual
Current Campus Power Capacity
500 MW
Actual
Current Site Area
171 hectares
Actual
Current Status Preconstruction
True
Actual
Demand Led Modular Build
True
Actual
Direct Liquid Cooling Ready
True
Actual
Wa3rm Heat Reuse Collaboration Signed
True
Actual
District Heat Letter Of Intent Signed
True
Actual
Diverse Fiber Entry Points
2 entry points
Actual
Meet Me Room Count
2 rooms
Actual
Carrier Neutral
True
Actual
Backup Generator Fuel Duration
48 hours
Actual
Power Distribution Redundancy
N+1
Actual