Skip to content

AtlasEdge STR001 Stuttgart Data Center

Böblingen, Baden-Württemberg, GermanyOperating
Evidence
Planned critical IT
11.2 MW
Updated
Oct 28, 2026

STR001 is AtlasEdge’s operating Böblingen facility and a current Stuttgart-IX core site. The profile distinguishes its published 11.2 MW IT boundary from actual tenant utilization and adds independently verified interconnection context. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Capacity

Reported capacity

Design

11.2 MW

Source

Reported capacity

Design

11.2 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

STR001 is AtlasEdge’s operating Böblingen facility and a current Stuttgart-IX core site. The profile distinguishes its published 11.2 MW IT boundary from actual tenant utilization and adds independently verified interconnection context. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Participants

AtlasEdge

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

STR001 | Böblingen | Baden-Württemberg | DE

Source

Location context

Actual

STR001 | Böblingen | Baden-Württemberg | DE

Source

Technical specifications

Renewable energy claim

Actual

100 percent

Source

Additional project facts

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

AtlasEdge publishes 11.2 MW of IT capacity at final expansion.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

11.2 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Operator confirmed

Actual

AtlasEdge

Source

Facility capacity basis

Actual

11.2 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Current lifecycle

Actual

Operating

Source

Operating model

Actual

Carrier neutral colocation

Source

Internet exchange

Actual

Stuttgart-IX core site

Source

Infrastructure & permits

Technical details (2)
Electric grid

Operational

11.2 MW

Facility IT boundary; customer utilization is not disclosed.

Fiber

Operational

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Public-source research. Plans may change. See Evidence for sources and qualifications.