AtlasEdge BCN002 Barcelona Data Center

Sant Joan Despí, Catalonia, SpainPreconstruction
Evidence
Planned critical IT
24 MW
Updated
Oct 28, 2026

BCN002 is AtlasEdge’s planned Sant Joan Despí facility. Independent market research describes 10 MW of secured initial IT delivery, expansion potential to 24 MW and an approximately 18,000-square-metre building; the 24 MW headline is future potential, not operating capacity. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Capacity

Reported capacity

Design

24 MW

Source

Reported capacity

Planned / design or future potential

24 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development, permitting and phased deliveryUnder construction

BCN002 is AtlasEdge’s planned Sant Joan Despí facility. Independent market research describes 10 MW of secured initial IT delivery, expansion potential to 24 MW and an approximately 18,000-square-metre building; the 24 MW headline is future potential, not operating capacity. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Milestones (1)
AtlasEdge acquired the powered development site

Jul 2024 · Recorded actual event

Completed · Land acquired

Source not linked

Participants

AtlasEdge

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

BCN002 | Sant Joan Despí | Catalonia | ES

Source

Location context

Actual

BCN002 | Sant Joan Despí | Catalonia | ES

Source

Gross floor area

Design

18,000 square metres

Source

Technical specifications

Renewable energy claim

Actual

100 percent

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

AtlasEdge publishes expansion potential to 24 MW for BCN002.

Source

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

24 MW is a published future facility or full build IT boundary; it is not operating load.

Source

Operator confirmed

Actual

AtlasEdge

Source

Facility capacity basis

Actual

24 MW is a published future facility or full build IT boundary; it is not operating load.

Source

Current lifecycle

Actual

Under development

Source

Operating model

Actual

Carrier neutral colocation

Source

Infrastructure & permits

Technical details (2)
Electric grid

Planned or represented

24 MW

Published IT design boundary; utility service and operating load remain distinct.

Fiber

Planned or represented

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Public-source research. Plans may change. See Evidence for sources and qualifications.