Ark Hilfield Park Campus
- Planned / design
- 200 MW
- Updated
- Oct 29, 2026
Ark proposes Hilfield Park on the former Mercure Hotel site at Tylers Way, Elstree. The December 2025 application describes four buildings, each with two independently operable wings; Ark’s separately marketed 6+ data centres are not a verified physical-building count. The operator targets approximately 200 MW of compute capacity, power delivery from 2028 and service in 2029. Its 250 MVA supply figure is not IT capacity. Application 25/1781/FUL is listed for Hertsmere’s 5 November 2026 committee, not approved by that listing. Current title, delivered power and operating capacity remain unverified.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
The December 2025 planning application proposes four buildings (HP1–HP4), each with two independently operable wings. Ark separately markets 6+ data centres; the sources do not establish that marketing count as a physical-building count. 250 MVA power supply is not IT capacity.
Milestones (3)
Dec 2025 · Recorded actual event
Completed · Announced
Sources (1)
2028 · Forecast / planned record
Forecast · Announced
Sources (1)
- Operator Hilfield Park campus · Primary
2029 · Forecast / planned record
Forecast · Announced
Sources (1)
- Operator Hilfield Park campus · Primary
Participants
Developer · Operator
Sources by role
Developer / Operator (1)
- Operator Hilfield Park campus · Primary
Site & development
Site location
Reported roundedFormer Mercure Hotel and land southeast, Tylers Way, WD25 8JH; one Hilfield Park campus, also marketed as Elstree. Do not confuse supply substations with site location.
SourceLand and site control context
Reported roundedApplicant says site held freehold; title not independently inspected.
SourceAdditional project facts
Planning and marketing scope
ActualThe December 2025 planning application proposes four buildings (HP1–HP4), each with two independently operable wings. Ark separately markets 6+ data centres; the sources do not establish that marketing count as a physical building count.
SourceReviewed hilfield committee listing
Reported roundedAs checked on 3 November 2026, Hertsmere lists application 25/1781/FUL as item 5B for its scheduled 5 November 2026 Planning Committee. The listing is not planning approval, and the officer report was not accessible in this review.
SourceInfrastructure & permits
Technical details (3)
Reported context
Planning statement identifies secured supply from Letchmore Heath; no MVA-to-MW conversion.
Reported context
Planning statement identifies proximity to dark fiber; named carriers unverified.
Planned or represented
250 MVA
Operator 250 MVA supply specification, target power delivery from 2028; not 250 MW IT.
Project map
Other · Documented
Ark Hilfield Park Campus
Sources (1)
Public-source research. Plans may change. See Evidence for sources and qualifications.