AQ Compute OSL1A Hønefoss Data Center

Hønefoss, Buskerud, NorwayOperating / Stabilized
Capacity
6 MW
Planned critical IT
Lead participant
AQ Compute
Developer
Last updated
Aug 28, 2026
Most recent public record update

About AQ Compute OSL1A Hønefoss Data Center

AQ-OSL1A is AQ Compute’s operating Hønefoss building and hosts NexGen Cloud’s initial AI deployment. Independent reporting confirms the first tenant’s 6 MW footprint and an option to expand to 14 MW; the profile does not confuse the wider campus or gross-power potential with current IT capacity. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load6 MWDesign · AQ Compute OSL1A Hønefoss Data Center
It Load6 MWDesign · AQ Compute OSL1A Hønefoss Data Center

Development

1 phases · 2 milestones
Operating facility and documented expansionOperational

AQ-OSL1A is AQ Compute’s operating Hønefoss building and hosts NexGen Cloud’s initial AI deployment. Independent reporting confirms the first tenant’s 6 MW footprint and an option to expand to 14 MW; the profile does not confuse the wider campus or gross-power potential with current IT capacity. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Feb 27, 2024
AQ-OSL1 inaugurated with NexGen Cloud as first tenant
Completed
Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridOperational

6 MW

Facility IT boundary; customer utilization is not disclosed.

FiberOperational

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
AQ-OSL1A | Hønefoss | Buskerud | NO
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
6 MW
Design
Capacity Basis
AQ Compute confirms 6 MW of operating IT capacity for AQ-OSL1A.
Actual
Location Context
AQ-OSL1A | Hønefoss | Buskerud | NO
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
6 MW
Design
Capacity Basis
6 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Operator Confirmed
AQ Compute
Actual
Facility Capacity Basis
6 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Current Lifecycle
Operating
Actual
Evidence Boundary
Facility specific evidence; campus or portfolio figures are not transferred between records
Actual
First Tenant
NexGen Cloud
Actual