AQ Compute BCN1 Barcelona Data Center Campus

Cerdanyola del Vallès, Catalonia, SpainUnder construction
Capacity
60 MW
Planned critical IT
Lead participant
AQ Compute
Developer
Last updated
Aug 28, 2026
Most recent public record update

About AQ Compute BCN1 Barcelona Data Center Campus

AQ-BCN1 is a multi-building campus in Parc de l’Alba. Public material separates the initial 15 MW building from a 60 MW campus design and discusses renewable-energy and liquid-cooling objectives; neither number is current operating utilization. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load60 MWDesign · AQ Compute BCN1 Barcelona Data Center Campus
Future Potential60 MWDesign · AQ Compute BCN1 Barcelona Data Center Campus

Development

1 phases · 2 milestones
Development, permitting and phased deliveryAnnounced Or Preconstruction

AQ-BCN1 is a multi-building campus in Parc de l’Alba. Public material separates the initial 15 MW building from a 60 MW campus design and discusses renewable-energy and liquid-cooling objectives; neither number is current operating utilization. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Mar 14, 2024
City and developer marked the start of construction
Completed
Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridPlanned Or Represented

60 MW

Published IT design boundary; utility service and operating load remain distinct.

FiberPlanned Or Represented

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
AQ-BCN1 | Cerdanyola del Vallès | Catalonia | ES
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
60 MW
Design
Capacity Basis
AQ Compute publishes 60 MW for the full AQ-BCN1 campus boundary.
Actual
Location Context
AQ-BCN1 | Cerdanyola del Vallès | Catalonia | ES
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
60 MW
Design
Capacity Basis
60 MW is a published future facility or full build IT boundary; it is not operating load.
Actual
Operator Confirmed
AQ Compute
Actual
Facility Capacity Basis
60 MW is a published future facility or full build IT boundary; it is not operating load.
Actual
Current Lifecycle
Under development
Actual
Evidence Boundary
Facility specific evidence; campus or portfolio figures are not transferred between records
Actual
Renewable Energy Target
100 percent
Forecast