Capacity
100 MW
Planned critical IT
Lead participant
Anan Data Centers
Operator
Last updated
Aug 25, 2026
Most recent public record update
About Anan Afula Data Center
Anan Afula Data Center is one physical Afula facility. Crusoe's 40 MW long-term allocation is a customer commitment within the site, part of the same site; historical 64/80 MW and current approximately 100 MW site scopes remain time-labeled.
Capacity
Planned critical ITOperating capacity—An operating IT-capacity figure has not been publicly disclosed.
It Load100 MWActual · Anan Afula Data Center
Design40 MWFact · Anan Afula Data Center
Development
1 phases · 2 milestonesAfula buildoutUnder Construction
Approximately 100 MW current site expectation; allocation and historical designs remain separated.
1 building
Apr 26, 2026
Anan–Crusoe 40 MW agreement reported
CompletedApr 28, 2026
Afula confirmed under construction
CompletedInfrastructure
Electric GridUnder Construction
100 MW approximate site design
Current expected site scope; utility contract and energization schedule not public.
Compute And Platform SystemSecured Or Contracted
40 MW customer allocation
Long-term allocation within Afula, not a separate facility or verified live load.
Project map
0 of 1 project point mappedInfrastructure facts
2
Mapped records
1
Capacity figures
2
No map point available
Power & interconnection: 1Site systems: 1
Facts & sources
Published claims and their source links.
Current Expected Site Capacity100 MW approximateActual
100 MW approximate
Building Area30,000 square metresFact
30,000 square metres
Construction StatusUnder constructionActual
Under construction
Crusoe Capacity Allocation40 MWFact
40 MW
Contract Expansion OptionTrueFact
True
Underground Floor Count1 floorFact
1 floor
Above Ground Storey Count3 storeysFact
3 storeys
Reported Site Area200 dunamsFact
200 dunams
Tzora Included In BoundaryFalseFact