Data center siteSite record

Aligned LBB-01

Abernathy, Texas, United StatesUnder construction
Capacity
2 MW
Planned / design
Lead participant
No public role record
Last updated
Aug 25, 2026
Most recent public record update

About Aligned LBB-01

Aligned LBB-01 is the first named physical facility within Project Caprock. TDLR registration scope, cost, dates and area attach only to LBB-01, not the full campus.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design2 MWFact · Aligned LBB-01
Design1 MWFact · Aligned LBB-01

Development

1 phases · 3 milestones
LBB-01 constructionUnder Construction

TDLR dates and cost attach to this facility only.

1 building

Apr 24, 2026
TDLR registered start
Day
Jan 1, 2027
Aligned LBB-01 service target
Forecast
Nov 15, 2027
TDLR registered completion
Forecast

Infrastructure

Electric GridPlanned Or Represented

2 MW UPS lineups

N+1 block redundant electrical design; 1 MW CDPs and 415 V rack distribution.

Project map

0 of 1 project point mapped
Infrastructure facts
1
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1

Facts & sources

Published claims and their source links.

15 facts
Facility Identifier
LBB-01
Actual
Public Address
1498 County Road 315, Abernathy, TX
Actual
Regulatory Project Address
1421 FM 54, Hale County, TX
Actual
Registered Project Area
190,694 square feet
Fact
Registered Estimated Cost
$425 million
Fact
Registered Start Date
2026-04-24
Actual
Registered Completion Date
2027-11-15
Actual
Legal Owner
Aligned Data Centers (Abernathy) Propco LLC
Actual
Design Firm
Corgan
Actual
Tenant Identity
Not assigned / undisclosed
Actual
Ups Lineup Capacity
2 MW
Fact
Redundancy
N+1 block redundant
Actual
Critical Distribution Capacity
1 MW CDPs
Fact
Rack Voltage
415 V
Fact
Service Level Uptime
100 percent
Fact