AirTrunk TOK2 West Tokyo
About AirTrunk TOK2 West Tokyo
TOK2 is a 110+ MW design campus that opened initial phases exceeding 60 MW in 2024 while phase 2 completion remained under development. AirTrunk TOK2 West Tokyo is located in Tokyo Prefecture, 13, JP and is a data center campus in partially operational status. Participants include AirTrunk as operator, Daiwa House Industry as general contractor, Tokyo Electric Power Company as utility, Obayashi Corporation as infrastructure contractor. Development comprises TOK2 initial operating phases (operating), TOK2 phase 2 (construction). Key milestones include TOK2 initial phases exceeding 60 MW open (2024-05-14) and TOK2 phase 2 tops out after initial opening (2024-09-03). electricity supply — 66 kV: TOK2 high-voltage supply with TEPCO power-infrastructure involvement. substation infrastructure: Obayashi identified in campus infrastructure delivery; asset boundary and ownership require contract review.
Program relationships
1 linkedCapacity
Operating critical ITDevelopment
2 phases · 5 milestonesOperating tranche confirmed May 2024; exact commissioned capacity not disclosed beyond 'over 60 MW'.
Potential overlap with the opening announcement's initial phases; no independent RFS evidence.
1 building
Infrastructure
66 kV
TOK2 high-voltage supply with TEPCO power-infrastructure involvement.
Obayashi identified in campus infrastructure delivery; asset boundary and ownership require contract review.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.