Cartis diligence evidence schedule

AirTrunk BOM2 Campus

PRJ-1309 · Site · Navi Mumbai, Maharashtra, India

Record last updated Oct 29, 2026

Scope and capacity

AirTrunk markets BOM2 in Mahape, Navi Mumbai, Maharashtra with more than 120 MW of total campus capacity. The site is part of its Indian platform following the Lumina acquisition. Public specifications describe power and connectivity, but do not establish how much capacity is commissioned or explicitly define the MW figure as IT load. 220 kV substation specification; commissioned condition not stated. Carrier-neutral with multiple entry paths per operator; named carriers not established. 5.4 ha per operator. Exact current operating load and unverified legal or financial details remain unknown.

Headline: 120 MW Planned / design

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Planned campus capacity MW · 120 MW

Planned / design or future potential · AirTrunk BOM2 Campus (Project)

Claim 162096 · Recorded claim type: Forecast · Review: Approved · Claim date: Not stated

Headline treatment: Selected headline

  1. BOM2 site specifications

    AirTrunk · Document date: Not stated · Primary

    Source reference: SRC-8186 · Company announcement · Recorded authority: Party primary

    Source URL

    https://airtrunk.com/location/bom2-mumbai/

Site location · Operator designated BOM2 campus in Mahape, Navi Mumbai, Maharashtra, 5.4 ha. Lumina acquisition/branding is not a separate project. Exact plot not disclosed in reviewed page.

Reported rounded · AirTrunk BOM2 Campus (Project)

Claim 162097 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Not stated

  1. BOM2 site specifications

    AirTrunk · Document date: Not stated · Primary

    Source reference: SRC-8186 · Company announcement · Recorded authority: Party primary

    Source URL

    https://airtrunk.com/location/bom2-mumbai/

Land and site control context · 5.4 Ha per operator.

Reported rounded · AirTrunk BOM2 Campus (Project)

Claim 162098 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Not stated

  1. BOM2 site specifications

    AirTrunk · Document date: Not stated · Primary

    Source reference: SRC-8186 · Company announcement · Recorded authority: Party primary

    Source URL

    https://airtrunk.com/location/bom2-mumbai/

Design PUE upper bound · Operator specifies design PUE below 1.4; not measured operating PUE.

Forecast · AirTrunk BOM2 Campus (Project)

Claim 162470 · Recorded claim type: Forecast · Review: Approved · Claim date: Not stated

  1. BOM2 site specifications

    AirTrunk · Document date: Not stated · Primary

    Source reference: SRC-8186 · Company announcement · Recorded authority: Party primary

    Source URL

    https://airtrunk.com/location/bom2-mumbai/

Built up area per building m2 · Operator specifies 22,700 square metres of built up area per building; not IT whitespace or a campus total, and no delivered area conclusion.

Reported rounded · AirTrunk BOM2 Campus (Project)

Claim 162471 · Recorded claim type: Reported rounded · Review: Approved · Claim date: Not stated

  1. BOM2 site specifications

    AirTrunk · Document date: Not stated · Primary

    Source reference: SRC-8186 · Company announcement · Recorded authority: Party primary

    Source URL

    https://airtrunk.com/location/bom2-mumbai/

Counterparties and capital

AirTrunk · Developer, Operator · CMP-0656

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed.