Skip to content
← Return to profile

Cartis diligence evidence schedule

Africa Data Centres NBO1 Sameer Expansion

PRJ-0577 · Site · Sameer Industrial Park, Nairobi, Kenya

Captured 2026-09-06T04:13:04.564Z · Record last updated 2026-08-26

SHA-256: 4daee52f58bbc928d0a975904b1c9671e4d2872dd37c4e6ddac1abd6e48b9ccb

Save a diligence baseline

Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.

The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.

Scope and capacity

Africa Data Centres announced and broke ground on an adjacent Sameer expansion that would begin with 5 MW and scale by up to an extra 15 MW. The current NBO1 page verifies an operating facility with 7.5 MW available site capacity, but does not confirm delivery of the announced expansion.

Headline: 7.5 MW Planned critical IT

Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.

Claims and exhibit sources

Current Nbo1 Status · Operational

actual · Africa Data Centres NBO1 Sameer Expansion (project)

Claim 53163 · Review: Approved · Claim date: Not published

  1. NBO1 Nairobi Data Centre

    Africa Data Centres · Document date: Not published · Primary

    https://www.africadatacentres.com/nairobi/

Current Available Site Capacity · 7.5 MW

actual · Africa Data Centres NBO1 Sameer Expansion (project)

Claim 53164 · Review: Approved · Claim date: Not published

Headline treatment: Selected headline

  1. NBO1 Nairobi Data Centre

    Africa Data Centres · Document date: Not published · Primary

    https://www.africadatacentres.com/nairobi/

Current Data Halls · 4 data halls

actual · Africa Data Centres NBO1 Sameer Expansion (project)

Claim 53165 · Review: Approved · Claim date: Not published

  1. NBO1 Nairobi Data Centre

    Africa Data Centres · Document date: Not published · Primary

    https://www.africadatacentres.com/nairobi/

Secured Server Space · 2,000 square metres

actual · Africa Data Centres NBO1 Sameer Expansion (project)

Claim 53166 · Review: Approved · Claim date: Not published

  1. NBO1 Nairobi Data Centre

    Africa Data Centres · Document date: Not published · Primary

    https://www.africadatacentres.com/nairobi/

Adjacent Expansion Envelope · 15 MW IT

actual · Africa Data Centres NBO1 Sameer Expansion (project)

Claim 53167 · Review: Approved · Claim date: 2022-11-30T00:00:00+00:00

Headline treatment: Separate claim, not added to the headline

  1. Africa Data Centres breaks ground on new Sameer facility in Nairobi

    Africa Data Centres · Document date: 2023-01-19 · Corroborating

    https://www.africadatacentres.com/africa-data-centres-breaks-ground-on-new-sameer-facility-in-nairobi/
  2. Africa Data Centres to expand Sameer facility in Nairobi by 15MW of IT load

    Africa Data Centres · Document date: 2022-11-30 · Primary

    https://www.africadatacentres.com/africa-data-centres-to-expand-sameer-facility-in-nairobi-by-15mw-of-it-load/

Adjacent Initial Module · 5 MW IT

actual · Africa Data Centres NBO1 Sameer Expansion (project)

Claim 53168 · Review: Approved · Claim date: 2022-11-30T00:00:00+00:00

Headline treatment: Separate claim, not added to the headline

  1. Africa Data Centres breaks ground on new Sameer facility in Nairobi

    Africa Data Centres · Document date: 2023-01-19 · Corroborating

    https://www.africadatacentres.com/africa-data-centres-breaks-ground-on-new-sameer-facility-in-nairobi/
  2. Africa Data Centres to expand Sameer facility in Nairobi by 15MW of IT load

    Africa Data Centres · Document date: 2022-11-30 · Primary

    https://www.africadatacentres.com/africa-data-centres-to-expand-sameer-facility-in-nairobi-by-15mw-of-it-load/

Adjacent Land Status · Secured

actual · Africa Data Centres NBO1 Sameer Expansion (project)

Claim 53169 · Review: Approved · Claim date: 2022-11-30T00:00:00+00:00

  1. Africa Data Centres to expand Sameer facility in Nairobi by 15MW of IT load

    Africa Data Centres · Document date: 2022-11-30 · Primary

    https://www.africadatacentres.com/africa-data-centres-to-expand-sameer-facility-in-nairobi-by-15mw-of-it-load/

Groundbreaking Date · 2023-01-19

actual · Africa Data Centres NBO1 Sameer Expansion (project)

Claim 53170 · Review: Approved · Claim date: 2023-01-19T00:00:00+00:00

  1. Africa Data Centres breaks ground for Sameer expansion

    The Standard · Document date: 2023-01-20 · Corroborating

    https://www.standardmedia.co.ke/counties/article/2001465620/adc-breaks-ground-for-expansive-facility
  2. Africa Data Centres breaks ground on new Sameer facility in Nairobi

    Africa Data Centres · Document date: 2023-01-19 · Primary

    https://www.africadatacentres.com/africa-data-centres-breaks-ground-on-new-sameer-facility-in-nairobi/

Announced Completion Target · H1 2024

Planned / design or future potential · Africa Data Centres NBO1 Sameer Expansion (project)

Claim 53171 · Review: Approved · Claim date: 2022-11-30T00:00:00+00:00

  1. Africa Data Centres breaks ground on new Sameer facility in Nairobi

    Africa Data Centres · Document date: 2023-01-19 · Corroborating

    https://www.africadatacentres.com/africa-data-centres-breaks-ground-on-new-sameer-facility-in-nairobi/
  2. Africa Data Centres to expand Sameer facility in Nairobi by 15MW of IT load

    Africa Data Centres · Document date: 2022-11-30 · Primary

    https://www.africadatacentres.com/africa-data-centres-to-expand-sameer-facility-in-nairobi-by-15mw-of-it-load/

Counterparties and capital

Africa Data Centres · Developer · CMP-1340

Cassava Technologies · Owner · CMP-1341

Investment Commitment

$500,000,000 · 2022-11-30

Africa Data Centres' broader hyperscale plan across Africa; no Nairobi allocation is disclosed.

Africa Data Centres (Sponsor) · Cassava Technologies (Other)

Financing record 160; claim-specific source links appear in the exhibit sources where published.

This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.