Data center siteSite record

AdaniConneX Chennai 1

SIPCOT IT Park, Chennai, TN, IndiaPartially operational
Capacity
33 MW
Planned critical IT
Lead participant
AdaniConneX
Operator
Last updated
Aug 26, 2026
Most recent public record update

About AdaniConneX Chennai 1

AdaniConneX opened the first 17 MW IT-load phase of Chennai 1 in 2022 at SIPCOT IT Park. The five-acre facility is designed to scale to 33 MW and added a live Extreme IX point of presence in 2025.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load17 MWActual · AdaniConneX Chennai 1
Future Potential33 MWDesign · AdaniConneX Chennai 1

Development

2 phases · 5 milestones
Phase 1Operational

17 MW IT-load first phase.

1 building

Full 33 MW buildPlanned

33 MW full-site potential; not a claim that all capacity is live.

1 building

Jan 1, 2021
Phase 1 construction began
Completed
Oct 1, 2022
Phase 1 listed ready for service
Completed
Nov 4, 2022
Chennai 1 formally launched
Completed
Jun 23, 2023
US$213 million portfolio construction facility announced
Completed
Mar 10, 2025
Extreme IX point of presence announced live
Completed

Infrastructure

Electric GridPartially Operational

17 MW IT

Ready for service October 2022.

Electric GridPotential Or Planned

33 MW IT

Full-site design potential; not all live.

FiberOperational

Extreme IX point of presence live from March 2025 announcement.

Renewable Energy SupplyReported Context

100 percent up to

Customer choice/availability statement; not audited hourly facility supply.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
3

No map point available

Power & interconnection: 3Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

13 facts
Phase 1 It Load
17 MW IT
Actual
Full Site It Potential
33 MW IT
Design
Site Area
5 acres
Actual
Construction Start
2021-01
Actual
Phase 1 Ready For Service
2022-10
Actual
Launch Date
2022-11-04
Actual
Designed Availability
100 percent
Design
Renewable Energy Choice
100 percent up to
Actual
Joint Venture Parent Share
50 percent
Transaction Scope
Joint Venture Parent Share
50 percent
Transaction Scope
Construction Structure
Composite and pre engineered steel
Actual
Extreme Ix Pop Status
Live
Actual
Portfolio Construction Facility
$213,000,000
Transaction Scope