Site
Stargate Abilene
Operating / Stabilized · Abilene, Texas, United States
- Capacity
- 1,200 MW
- Planned / design
- Verified
- Aug 18, 2026
A view-only collection of public Cartis project and company profiles.
This link contains public record references only. It does not reveal the creator’s browser history, review status, private notes, or unpublished Cartis data. Open each profile for its source and verification details.
Stable public fields are aligned side by side. Programs never inherit or sum child-site operating capacity.
| Comparable field | Stargate Abilene | Project Kilby Power Facility |
|---|---|---|
| Record type | Site | Site |
| Status | Operating / Stabilized | Preconstruction |
| Location | Abilene, Texas, United States | Pecos area, Texas, United States |
| Headline capacity | 1,200 MW · Planned / design | No reviewed public value |
| Reviewed operating MW | No reviewed public value | No reviewed public value |
| Owner / developer | Crusoe | Energy Forge One LLC |
| Utility | Under verification | No reviewed public value |
| ISO / RTO | No reviewed public value | No reviewed public value |
| Reviewed facts | 0 public facts | 0 public facts |
| Latest verification | Aug 18, 2026 | Aug 25, 2026 |
Shaded rows differ across the selected records. Blank values remain blank; Cartis does not infer or substitute missing public data.
Operating / Stabilized · Abilene, Texas, United States
Preconstruction · Pecos area, Texas, United States
Save public profiles to a device watchlist, then create a separate view-only link.