Preconstruction · Fort Worth, Texas, United States
- Capacity
- 384 MW
- Planned / design
- Verified
- Aug 27, 2026
A view-only collection of public Cartis project and company profiles.
This link contains public record references only. It does not reveal the creator’s browser history, review status, private notes, or unpublished Cartis data. Open each profile for its source and verification details.
Stable public fields are aligned side by side. Programs never inherit or sum child-site operating capacity.
| Comparable field | STACK AllianceTexas Data Center Campus | Meta Fort Worth Data Center |
|---|---|---|
| Record type | Site | Site |
| Status | Preconstruction | Operating / Stabilized |
| Location | Fort Worth, Texas, United States | Fort Worth, Texas, United States |
| Headline capacity | 384 MW · Planned / design | No reviewed public value |
| Reviewed operating MW | No reviewed public value | No reviewed public value |
| Owner / developer | STACK Infrastructure | Meta Platforms, Inc. |
| Utility | No reviewed public value | No reviewed public value |
| ISO / RTO | No reviewed public value | No reviewed public value |
| Reviewed facts | 0 public facts | 0 public facts |
| Latest verification | Aug 27, 2026 | Aug 27, 2026 |
Shaded rows differ across the selected records. Blank values remain blank; Cartis does not infer or substitute missing public data.
Preconstruction · Fort Worth, Texas, United States
Operating / Stabilized · Fort Worth, Texas, United States
Save public profiles to a device watchlist, then create a separate view-only link.