Preconstruction · London, England, United Kingdom
- Capacity
- —
- Verified
- Aug 28, 2026
A view-only collection of public Cartis project and company profiles.
This link contains public record references only. It does not reveal the creator’s browser history, review status, private notes, or unpublished Cartis data. Open each profile for its source and verification details.
Stable public fields are aligned side by side. Programs never inherit or sum child-site operating capacity.
| Comparable field | Global Switch London South | Global Switch London North |
|---|---|---|
| Record type | Site | Site |
| Status | Preconstruction | Operating / Stabilized |
| Location | London, England, United Kingdom | London, England, United Kingdom |
| Headline capacity | No reviewed public value | 18 MW · Planned critical IT |
| Reviewed operating MW | No reviewed public value | No reviewed public value |
| Owner / developer | Global Switch | Global Switch |
| Utility | No reviewed public value | No reviewed public value |
| ISO / RTO | No reviewed public value | No reviewed public value |
| Reviewed facts | 0 public facts | 0 public facts |
| Latest verification | Aug 28, 2026 | Aug 28, 2026 |
Shaded rows differ across the selected records. Blank values remain blank; Cartis does not infer or substitute missing public data.
Preconstruction · London, England, United Kingdom
Operating / Stabilized · London, England, United Kingdom
Save public profiles to a device watchlist, then create a separate view-only link.