Operating / Stabilized · Columbus, Ohio, United States
- Capacity
- 40 MW
- Planned / design
- Verified
- Sep 1, 2026
A view-only collection of public Cartis project and company profiles.
This link contains public record references only. It does not reveal the creator’s browser history, review status, private notes, or unpublished Cartis data. Open each profile for its source and verification details.
Stable public fields are aligned side by side. Programs never inherit or sum child-site operating capacity.
| Comparable field | Cologix COL4 Columbus Data Center | Cologix Johnstown AI Data Center Campus |
|---|---|---|
| Record type | Site | Site |
| Status | Operating / Stabilized | Preconstruction |
| Location | Columbus, Ohio, United States | Johnstown, Ohio, United States |
| Headline capacity | 40 MW · Planned / design | 800 MW · Planned / design |
| Reviewed operating MW | No reviewed public value | No reviewed public value |
| Owner / developer | Cologix, Inc. | Cologix, Inc. |
| Utility | No reviewed public value | No reviewed public value |
| ISO / RTO | No reviewed public value | No reviewed public value |
| Reviewed facts | 0 public facts | 0 public facts |
| Latest verification | Sep 1, 2026 | Sep 1, 2026 |
Shaded rows differ across the selected records. Blank values remain blank; Cartis does not infer or substitute missing public data.
Operating / Stabilized · Columbus, Ohio, United States
Preconstruction · Johnstown, Ohio, United States
Save public profiles to a device watchlist, then create a separate view-only link.