Cartis diligence evidence schedule
NorthC Amsterdam 1
PRJ-1275 · Site · Amsterdam, Netherlands
Captured 2026-10-06T04:33:59.934Z · Record last updated 2026-10-05
SHA-256: 7c034b00b4ae49e53195e2c1b5c073c18049d79042b8621a0f801c7d5ac01b0e
Save a diligence baseline
Download the public evidence as it appears now. Compare a previously saved snapshot to see added, removed and changed claims, counterparties, financing and milestones. Files are read in this browser and are not uploaded.
The fingerprint detects file changes; it is not a digital signature or a claim of independently verified authenticity. Keep your downloaded copy with the transaction file.
Scope and capacity
NorthC Amsterdam 1 is an operating colocation facility at Kabelweg 48a, 1014 BB Amsterdam. NorthC’s factsheet describes 5,000 square metres of total surface and 2,500 square metres of data-floor area. Its electrical architecture uses 2 × 10 kV utility feeds, N+1, with UPS N+1 and backup generators N+1. Cooling uses direct adiabatic air cooling, n+1. The facility offers carrier- and cloud-neutral interconnection, A/B meet-me rooms and access to NorthC’s Region Connect Ring. The operator lists 2.4 MW of installed electrical capacity. The rating describes the facility’s installed electrical capacity. AMS-IX separately lists the site at Kabelweg 48a as NorthC Amsterdam (AMS01). That operator-qualified name distinguishes it from facilities using similar Amsterdam codes.
Headline: 2.4 MW Facility design
Numbers refer to their stated physical boundaries and are not added together. Source dates, claim dates and record updates have different meanings. Missing dates and locators are not inferred.
Claims and exhibit sources
Street Address · Kabelweg 48a, 1014 BB Amsterdam
actual · NorthC Amsterdam 1 (project)
Claim 159091 · Review: Approved · Claim date: Not published
- Amsterdam 1 data center
NorthC Datacenters · Document date: Not published · Primary
https://www.northcdatacenters.com/en/northc-datacenters/amsterdam/
Facility Area · 5,000 sqm
actual · NorthC Amsterdam 1 (project)
Claim 159092 · Review: Approved · Claim date: Not published
- Amsterdam data center factsheet
NorthC Datacenters · Document date: Not published · Primary
https://www.northcdatacenters.com/wp-content/uploads/2023/10/Amsterdam_Datacenter_Factsheet_NorthC_NL.pdf
Data Floor Area · 2,500 sqm
actual · NorthC Amsterdam 1 (project)
Claim 159093 · Review: Approved · Claim date: Not published
- Amsterdam data center factsheet
NorthC Datacenters · Document date: Not published · Primary
https://www.northcdatacenters.com/wp-content/uploads/2023/10/Amsterdam_Datacenter_Factsheet_NorthC_NL.pdf
Facility Design Electrical Capacity Mw · 2.4 MW
Facility electrical / design capacity · NorthC Amsterdam 1 (project)
Claim 159094 · Review: Approved · Claim date: Not published
Headline treatment: Selected headline
- Amsterdam data center factsheet
NorthC Datacenters · Document date: Not published · Primary
https://www.northcdatacenters.com/wp-content/uploads/2023/10/Amsterdam_Datacenter_Factsheet_NorthC_NL.pdf
Ups Redundancy · UPS N+1
actual · NorthC Amsterdam 1 (project)
Claim 159095 · Review: Approved · Claim date: Not published
- Amsterdam data center factsheet
NorthC Datacenters · Document date: Not published · Primary
https://www.northcdatacenters.com/wp-content/uploads/2023/10/Amsterdam_Datacenter_Factsheet_NorthC_NL.pdf
Historical Ownership · The Datacenter Group owned and operated its existing Amsterdam 1 facility in August 2018
actual · NorthC Amsterdam 1 (project)
Claim 159096 · Review: Approved · Claim date: Not published
- Datacenter connectivity
AFIBER · Document date: Not published · Corroborating
https://www.afiber.net/en/solutions/datacenter-connectivity/ - Rabobank Bouwfonds Communication Infrastructure Fund
Van Lanschot Kempen · Document date: Not published · Primary
https://www.vanlanschotkempen.com/en-nl/investment-banking/corporate-finance/transactions/2018/rbcif-august
Cooling Water Treatment · Pathema reports circular, chemical free cooling water treatment installations delivered in Amsterdam 1 during 2019–2022. Performance percentages apply to the multi site case study.
actual · NorthC Amsterdam 1 (project)
Claim 159103 · Review: Approved · Claim date: Not published
- NorthC cooling-water treatment case study
Pathema · Document date: Not published · Primary
https://www.pathema.nl/en/case/northc
Counterparties and capital
AMS-IX · Supplier · CMP-1715
NorthC Datacenters · Operator · CMP-1714
This schedule captures public Cartis research. It is not a title, lien or legal-opinion report. Document page/section locators and claim review timestamps are included only when published; this version has no separate locator or claim-review-time feed. Downloaded snapshots are retained by you; Cartis does not archive them automatically.